|
Kembla Grange should be up and running sometime early in the new year. Its a very fast track with some tight technical parts to it, a lot of people are anxious ride/race there, the owners know this and are doing there best to get it up and running as soon as possible.(bear in mind, a LOT of work was required, to bring it up to scratch...90%of this work is complete). The moment NSWminimoto Club receive's any news regarding Kembla Grange track it will be posted to all relavant forums/web sites.
__________________
2008 2009 NSW State Champion |